alt                      alt

WABO/SEAW Liaison Committee

White Papers

 

Committee Mission Statement:

  • Improve communications between the public jurisdictions that administer building codes and the engineering design community that prepares construction documents.

  • Improve consistency and quality of engineering submittals and project reviews.

  • Build consensus between the engineering design community and building officials with regard to code interpretation and submittal requirements.

 WABO Committee Members: Chris Ricketts, Jon Siu, Lee Kranz, Cheryl Burwell.

Structural Plan Review Philosophy - Article by WABO/SEAW Committee

Structural Plan Review Philosophy - A WABO/SEAW White Paper #1 Tune Up

(click on title to read entire white paper)

WP-1 Guideline - Structural Plan Review Philosophy
WP-2 Wet Sealing and Signing of Structural Submittals
WP-3 Guideline for Determining Wind Loads on Structures
WP-4 Structural Permit Submittal Guidelines
WP-5 Guideline - Post-Disaster Contract Safety Evaluations
WP-6a Phased Permit Approvals
WP-6b Deferred Submittals
WP-7 Seismic Design and Gravity Support Requirements for Nonstructural Components
WP-8 Guidelines for Determining Snow Loads in Washington State
WP-9 Threaded Rod Holdown Systems In Wood Frame Buildings
WP-10 Guards and Connections
WP-11 Designing for Heavy Vehicle Loads on underground vaults, bridges, buildings and structures